Health-department requirements

Opening a Kitchen in District of Columbia? Equipment You’re Required to Install

The equipment a District of Columbia health department expects — from the FDA Food Code — plus who licenses you here and how plan review works.
Verified from primary sources. Educational, not legal advice — always confirm with your local health department.

What every commercial kitchen must have

These come from the FDA Food Code, which nearly every state adopts. A health inspector checks for them on plan review and at inspection — regardless of your state:

Also required in most kitchens: a mop/service sink (cleaning-water disposal), mechanical exhaust hood (Type I over grease/smoke), adequate hot water, indirect waste/air gaps on food & warewashing equipment, and a grease interceptor where local plumbing code requires it.

How District of Columbia licenses & reviews you

Licensing authority: DC Health (DOH) under Title 25-A, DC Municipal Regulations. Regime: Single-jurisdiction licensing.

CONCRETE BUILD SPECS, unusually precise. Clean water tank: CARTS 5 gallons, VEHICLES/TRAILERS 38 gallons. Unit height must not exceed 10 ft 6 in measured from bottom of tire to top of unit. Equipment must be ANSI/NSF or equivalent. Fees: $100 per Health Certificate application, plus $75 for HACCP review where required - a Mobile Vending HACCP plan (Form C) is required for operations preparing or serving food needing further processing. Applicant must hold a DC-issued Certified Food Protection Manager certificate. SERVICE SUPPORT (DEPOT) IS MANDATORY: food preparation only at a licensed food establishment, evidenced by a signed Depot Letter (Form B), with ADDITIONAL depot letters where other support services happen elsewhere. PARKING RULE THAT CATCHES PEOPLE: units must be parked at the depot or a secured location outside operating hours - RESIDENTIAL PARKING IS NOT PERMITTED, and street parking is not permitted. Application is published in seven languages.

Mobile/food-truck reciprocity: N/A - single jurisdiction

New builds and remodels almost always require a plan review and a pre-opening inspection. Submit your equipment layout early — the sink count, hood, and hot-water sizing are the usual sticking points.

Local dealers who can spec a compliant kitchen

See restaurant-equipment dealers in District of Columbia → — many do design + fabrication and know local plan-review requirements.